
Rev E 12/2/14 pg. 91
2. Open the pump doors.
2.1 Unscrew the six acorn nuts on the
back of the instrument and remove
the clear back panel to access the
pump area.
2.2 Un-latch the two pump doors so
they are open.
2.3 Reinstall the clear back panel and
tighten the acorn nuts.
When returning the instrument to service after a period of non-use, you must close
and latch the pump doors and charge all of the lines before running. See the
IDF/SDF Analysis, TDF Analysis, or Diagnostics sections of this manual for
information about charging the lines.
Acorn Nuts (the top two are behind the black torsion bar)
Comentários a estes Manuais