Ankom TDF Dietary Manual do Utilizador Página 55

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 96
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 54
Operator’s Manual
Rev E 12/2/14 pg. 55
20. Start the instrument.
The instrument is now completely set up and ready to automatically run the TDF procedure. Press the START button to
begin. At the beginning of each new run, the instrument automatically runs a tube integrity test.
For the first run after a power-up cycle, or for the first run after the instrument has been idle for twelve hours, the
following screen will be displayed.
If the fluid lines are already charged properly, or when the line charge is complete, the following screen will be displayed.
When the tube integrity check is complete, the instrument will automatically execute the TDF procedure stopping only for
faults, aborts, and manual pH adjustment. The Status screen will show actions and faults as they occur during the
automatic operation.
Testing pump tubing.
Please wait..........
Initializing lines…
Amylase
EtOH78
Protease
EtOH95
AMG
Water
HCL
Buffer
Vacuum sensor:
AAAA
psi
Press START to begin
AOAC 985.29 TDF
START
Vista de página 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 95 96

Comentários a estes Manuais

Sem comentários