Ankom 2000 Series Manual do Utilizador Página 12

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 11
Operator’s Manual
pg. 12 Rev E 1/14/15
6.
If you are using Cubetainers for your chemicals, install the Cubetainer Shelf shown below (Optional).
IMPORTANT
The solutions are gravity fed into the instrument ports. The bottom of the solution level
must be at least 5” (13cm) above the port. The top of the solution level can be no more
than 20” (50cm) above either port or the solution will overflow into the drain.
Vista de página 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 51 52

Comentários a estes Manuais

Sem comentários